Dongguan Zehui machinery equipment co., ltd

Dongguan Zehui machinery equipment co., ltd specialized in manufacture foam machine and cutting machine A professional one-stop mattress machinery , sponge machinery & accessories manufacturer

Manufacturer from China
Verified Supplier
8 Years
Home / Products / Foam Making Machine /

Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line

Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line

Ask Latest Price
Brand Name :ZHMACH
Model Number :ZHF-2018
Certification :CE
Place of Origin :China mainland
MOQ :one set
Price :US $132,000-152,000 / Sets
Payment Terms :L/C, T/T
Supply Ability :2 Set/Sets per Quarter
Delivery Time :50-60 days
Packaging Details :Continuously Automatic Horizontal Mattress Sponge Foam Making Machine Line will be naked packing, and some parts in wooden case. Totally need 2*40HQ container and 1*20GP contrainer
Processing Type :Foaming Machine
After-sales Service Provided :Engineers available to service machine overseas
Dimension(L*W*H) :L33m*W4.5m*H3.2m
Motor/Invetor :siemens/ donggguan motor and Delt
Foam top control system :R.S. pulling system
Block cutter :Blade & Saw tooth double knife Type
Flow meter :Glass flow meter
Foaming Way :overflow box and spray head
Machine Control way :automatic PLC and invertor control
Pump :US. Viking/ Chinese/ Japanese
Contact Now

Add to Cart

Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
View Product Description

Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line

Product Description

The Foam Production Line is a automatic continuous foaming machine for producing flexible polyurethane foam used in furniture, shoe material, packing, electron, garment and transportation industrial. It’s the ideal production equipment for large-scale foaming

For the process of foaming

Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process

Max.Output Capacity 200~350kg/min(Continuous Type)
Mixer Total Power 37kw
Max.Mixing Speed 2500~6000r/min
Foaming Type Trough & Sprayer
Standard Material Q.T.Y. 13 Groups.
Foaming Size W2300mm*H1300mm(Width Adjustable)
Control System PLC Digital Touch Screen
PPG Tank 5Ton*1Set.
POP Tank 5Ton*1Set.
TDI Tank 5Ton*1Set.
MC Tank 2Ton*1Set.
Caco3 Tanks 5Ton*1Set
T-9/Amine/Color 1ABCD/ Silicone /Water Tanks 180L*8Sets
Side Wall Size L16m*H1200mm
Fall plate L8.5m*W0.98~2.4m(Adjustable)
Foaming Platform L2000mm*W3000mm*H700mm
Conveyor Line L16.9m
Side/Bottom Paper Feed & Rewind System 2Sets.
Walkway W500mm*L15m
Air Valves U.S. Standard
Chiller(Both Cooling & Heating System) 1Set*1.5HP
R.S.Pulling System 1Set.
Foaming Density Range 8~150kg/Cubicmeter.
Match With Block Cutter 1Set.
Total Motor Power Approx 125kw.
Machine N.W. Approx 30 Ton
Floor Space Required L45m*W5m*H4.5m.

Packaging & Shipping

1. The Foam machine sponge making machine nacked packing and some spares parts we will pack in the wooden case also in order to save the place we will also put some parts into the material tanks.

2.Then we can save the cost of shippment and for one 13groups machine we need 2*40HQ+1*20GP three containers only

Our Services

1.We will help to design the layout of the machine that put in your factory.We will send 2-4 experience engineers to install and testing the machines.

2.We will teach your engineer how to operate the machine and how to maintain the machines.

3.We will give you the machine operation manual and the best formulation for target products that you are going to make.

4.We will help to buy the best raw material for making the foam if you needed.

FAQ

Q: How many days for the install and testing of the machine?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

Q: For the cost of the engineer how much I need to pay?

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

Q:What kind of raw material tools we need to prepare for the testing?

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line

Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line

automatic foaming machine line.pdf

China Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line for sale

Fully Automatic Continuous Foam Sheet Bed Mattress Foaming Production Line

Inquiry Cart 0