
Add to Cart
Horizontal Continuous Foaming Production Machine For Sponge / Mattress
This Foam Production Line is a automatic continuous foaming machine for producing flexible polyurethane foam used in furniture, shoe material, packing, electron, garment and transportation industrial. It’s the ideal production equipment for large-scale foaming.
Main Specification
Oven Length | 18m |
Inner Conveyer length | 18m |
Foaming Height | 1.0-1.25m | Side Borar Adjustable Width
| 0.98-2.3m |
Foaming Width | 1.0-2.25m | Conveyer Belt Speed
| 0-8m/min |
Foaming Density | 8-100kg/m3 | Fall Plate
| Six section adjustable |
Total Power | 130KW | Total output
| 100-300kg/min |
Transducer Types
Model | Power/kw | Use
| Qty | Brand |
FC360 | 37 | Mixing head
| 1 | Danfoss |
FC-051P | 7.5 | PPG+CaCo3
| 1 | Danfoss |
FC-051P | 5.5 | PPG
| 1 | Danfoss |
FC-051P | 4 | TDI
| 1 | Danfoss |
FC-051P | 2.2 | MC , Flame retardant
| 2 | Danfoss |
FC-051P | 1.5 | Black
| 1 | Danfoss |
FC-051P | 0.75 | Water, Ann, Si, Tin, Color A/B Anti-yellow | 7 | Danfoss |
FC-051P | 0.75 | Spray head
| 1 | Danfoss |
FC-051P | 5.5/3.7/1.5 | Oven inner conveyer line,side conveyer line, cutting machine | 3 | Danfoss |
FC-051P | 7.5 | Conveyor belt
| 1 | Danfoss |
Pump of loding material
Model | Specification
| Use | Qty/set | Brand |
KCB-83.3 | 200L/min
| PPG Loding | 1 | China |
CB-13 | 200 L/min
| PPG+CaCo3 loding | 1 | China |
NB-63 | 120 L/min
| TDI loding | 1 | Shanghai |
NB-32 | 30 L/min
| MC loding | 1 | Shanghai |
KCB-55 | 25 L/min | Flame retardant loding | 1 | China |
Techniques and After-sale Services:
1, Buyer should assist seller to undertake the testing. Both seller and buyer should be responsible for the on-site testing of the production line. The testing is mainly for three formulas including high, medium and low density.
2, During the testing, If the raw material waste is caused by seller’s technical problems or the quality of the production line (i.e. foam collapse, burnings, or machine malfunction), the additional portion of the raw materials that over 2 tons are on seller’s account. The problems not related to seller’s are on buyer’s account.
3, During installation, seller will send technicians to buyer’s place of business. Buyer should arrange his staffs to assist the technicians with the installation, and prepare water, electricity and place for installation.
4, The machines are in simple packing.
5, During installation and testing, buyer is responsible for the food, Visa fee, turn-round flight tickets and accommodation for the technicians sent by seller. Buyer also should pay $40/day/person as the allowance for the technicians sent by the seller.
6, The machines are under one year warranty (in the circumstance of normal use). Natural damage, non-professional demolition, maintenance errors are not within the scope of warranty.
7, After warranty period, seller will provide paid service for machine maintenance.
Payment Terms:
After signing of the contract, buyer pays as the advance payment 30% of total price , when seller gets the deposit, the contract takes into effect; the balance of 70%will be paid by buyer before shipment.