
Add to Cart
Horizontal Flexible Foam Making Machine Line for mattress and pillow
The ZHF-2017 Horizontal Continuously foam production line is an automatic continous foaming machine for producing flexible polyurethane foam used in furniture,shoe material,packing,electron,garment and transportation industrial.it's the ideal production equipment for large-scale foaming.
We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.
Main specification
Foaming controlling Platform (standard) | L3m×W2.52m×H0.7m |
Oven declining board (standard) | L6.8m×W0.98m~2.4m |
Oven side links (standard) | L18m×W2.4m×H1.2m |
Oven machine frame (standard) | L18m ×W4m×H3m |
total power | L18m×W2.4m×H0.83m |
Oven inner conveyer line (standard) | 18m |
Foam block cutter machine (standard) | W2.4m×H1.30m (knife belt with cross type) |
conveyer belt speed | 0-8m/min |
fall plate | seven section adjustable |
R.S Pulling system | one set |
machine dimension | L35× W4.2 ×H3.2m |
Main technique specification:
Dimension | Total length 35m×Total width 4m×Total Height 3m |
Foaming material Group | 13 groups, man-machine interface, both manual and automatically computer control |
Foaming width | 980mm~2250mm |
Foaming height | Max 1200mm |
Foaming density | 8Kg/m³~100kg/m³ |
Foaming speed | 2000r/min~7000r/min |
Max total output | 300kg/min |
Material spraying way | ① The way of down sprayer head (upper, down, front, back can be adjusted) ② the way of trough overflow pipe. |
Controlling way of foaming | ①PLC controlling, can continuously foaming two different formulas in one time ②All inverter controlling foaming and work in phase with the production line ③Oven declining board height and width can be adjusted by control box. ④Oven side links width can be adjusted by control box |
Mixing –head motor | 37kw |
Total power | About 90kw |
FAQ:
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:During the foaming if we have some problems abt the foam and the machine how can we do ?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
The main part of the machine