
Add to Cart
Automatic Continuous Low Pressure Foaming Machine For Polyurethane Sponge 18Kg / m³
This machine is mostly used for producing of soft urethane foam rubber productions
(density is about 10-50kg/m³).
It’s automaton-action level is high.the production is low low cost and the operation is
simple.It is desirable equipment to manufacture products of foam rubber in furniture,
shoes,circumference,electron clothing andautomobile industry.
(2) Main Specification
Oven Length | 18m | Inner Conveyer length | 18m |
Foaming Height | 1.0-1.25m | Side Borar Adjustable Width | 0.98-2.3m |
Foaming Width | 1.0-2.25m | Conveyer Belt Speed | 0-8m/min |
Foaming Density | 8-100kg/m3 | Fall Plate | Six section adjustable |
Total Power | 130KW | Total output | 100-300kg/min |
(3) Material pot types: (The work pressure in the pot is normal pressure)
Type | Use | Specification | Qty |
Big material tank | PPG | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | POP | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1
|
Big material tank | CaCo3 | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | TDI | 5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system
| 1
|
Big material tank | Flame retardant | 2m³/δ3m stainless steel, with filter system | 1 |
Big material tank | MC | 2m³/δ2mm stainless steel, with filter system | 1 |
Small material tank | Si | 180L/δ1mm stainless steel | 1 |
Small material tank | A-33 | 180L/δ1mm stainless steel, with filter system | 1 |
Small material tank | T9 | 180L/δ1mm stainless steel, with filter system | 1 |
Small material tank | H2O | 180L/δ1mm stainless steel | 1 |
Small material tank | Color | 180L/δ1mm stainless | 1 |
Small material tank | Anti-yellow | 180L/δ1mm stainless steel | 1 |
Small material tank | Black | 180L/δ1mm stainless steel | 1 |
Floor powder mixing tank | PPG, POP, Powder | 1.5m³/δ3mmA3 steel plate, with filter system | 1 |
Filter tank | POP, Powder | 1.5m³/δ4mmA3 steel plate | 1 |
(4) Marks: | ||||||
1. According to seller's standard designed drawing diagrame to arrange the production and inspection. | ||||||
2. if customer reqiure, techincians will be sent by seller, and the turn-round tickets fee, vise fee, $40 per day of allowance fee and hotel accommodation are in charge of buyer. | ||||||
3. Payments Terms: T/T 30% advance before production.the balance of total amount 70% will be paid before shipment. | ||||||
4. Delivery forms: Send to ShenZhen Seaport | ||||||
5. Spare parts: Offer assorted maintain tools. | ||||||
6. Package: paper & film package. | ||||||
7. Voltage: all the eqiupments are: 380V, 50HZ, 3P.(Voltage can be changed, but price need to increase 3%) | ||||||
8. Delivery date: 45 days (after seller get the advance). | ||||||
9. All the machines maintain for one year, if the damages caused by machine itself, excluding the man-made accidents, the broken parts offered by seller in free of charge, but the transport cost for buyer's account. |
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.